Schedule Planning (4 cr)
Code: RAK2I2-3017
General information
- Enrollment
-
17.04.2023 - 11.10.2023
Registration for the implementation has ended.
- Timing
-
30.10.2023 - 28.01.2024
Implementation has ended.
- Number of ECTS credits allocated
- 4 cr
- Local portion
- 4 cr
- Mode of delivery
- Contact learning
- Unit
- SeAMK Construction Engineering and Construction Management
- Campus
- SeAMK Seinäjoki, Frami
- Teaching languages
- Finnish
- Degree programmes
- Bachelor of Engineering, Construction Engineering
- Teachers
- Jarkko Piikkilä
- Course
- RAK2I2
Evaluation scale
1-5
Objective
Competence in the construction process
Students are competent in planning various schedules for the construction project with the help of project management programmes.
Students are competent in planning cost-efficient schedules.
Competence in repair construction
Students are competent in planning various schedules for repair construction projects.
Content
- schedule planning for construction projects
- types of schedules
- general, stage-specific and weekly planning and planning of schedules
- project management programmes
Materials
Material distributed by the teacher
Assessment criteria, satisfactory (1)
The student knows the basics of schedule planning for a construction site and is able to make line and slash schedules. The student is able to use schedule software in schedule planning. The student knows the different timetables of the construction site and is able to make simple schedules.
Assessment criteria, good (3)
The student knows the basics of schedule planning for a construction site and is able to make line and slash schedules. The student is able to use schedule software in schedule planning. The student masters the different timetables of the construction site and is also able to make more demanding schedules.
Assessment criteria, excellent (5)
The student knows the basics of schedule planning for a construction site and is able to make line and slash schedules. The student is able to use schedule software in schedule planning. The student masters the different timetables of the construction site and is also able to make more demanding schedules, also taking the resources of the construction site into account.
Qualifications
Construction Economics.