Objective

Competence in Construction Process
Students are capable of controlling project costs.

Competense in Construction Economics
Students are competent in calculating the target price for a project and the extent of a project and in estimating the need for building components.

Content

- Calculating the target price and extent of a project
- Estimating the need for building components
- Use of TAKU software
- Cost control

Materials

Lecturer’s own material

Teaching methods

Lectures, assignments

Student workload

Total work load of the course: 80 h, lectures 10 h, assignment 70 h

Evaluation scale

1-5

Assessment criteria, satisfactory (1)

The student is able to calculate the target price of a project. Based on the plans, the student can make a building component assessment for a project. The student is able to develop a project.

Assessment criteria, good (3)

The student is able to calculate the target price of a more demanding project. Based on the plans, the student can make a building component assessment for a more demanding project and to develop the project based on their calculations.

Assessment criteria, excellent (5)

The student is able to calculate the target price of a very demanding project. Based on the plans, the student can make a building component assessment for a very demanding project and to develop the project based on their calculations.

Assessment methods and criteria

Assignment, scale is 1-5.

Qualifications